|
1
|
Cut
crew stairwell canopies and narrow |
88
|
Replace
tank room covers with GMM set |
|
2
|
Construct
pelorus (x2) |
89
|
Tank
room cover supports added |
|
3
|
Binocular
boxes for wing cab bulwarks |
90
|
Tank
room catwalk railing added to cover roof |
|
4
|
Deckhouse
lamps added |
91
|
Protective
planks on tank room aft railings over aft GSC |
|
5
|
Railing
deck lamps added |
92
|
Officer's
deckhouse walls cut and rearranged |
|
6
|
Footrailing
for bridge/wing cab bulwark |
93
|
Lifeboat
tiedowns |
|
7
|
Bridge
instruments added |
94
|
Lifeboat
names/numbers/capacity decals |
|
8
|
Deckhouse
ladders added (missing from kit - 7) GMM spares |
95
|
Lifeboat
grab ropes |
|
9
|
Deckhouse
ladders from kit (6) (replace with GMM spares) |
96
|
Emergency
lifeboats hollowed out |
|
10
|
Cowl
vents added/altered |
97
|
Oars
added to emergency boats |
|
11
|
Curl
vents added/altered |
98
|
Lifeboat
davit block and tackle added (GMM) |
|
12
|
Gibb
vents added/altered (behind #1 & 4 funnels) |
99
|
#2 funnel vents moved back |
|
13
|
Safety
lines and poles #1 funnel |
100
|
Raised
roof curl vent ducts added to deckhouse walls |
|
14
|
Wheelhouse
windows modified |
101
|
Raised
lounge bay window roof alcove straightened |
|
15
|
Water
barrel added behind #1 funnel |
102
|
Deck
chairs added (GMM) |
|
16
|
Cargo
span eyebolts on wheelhouse roof |
103
|
People
added (GMM) |
|
17
|
Small
skylight on wheelhouse roof |
104
|
Emergency
boat secure rigging |
|
18
|
Bridge
roof planked |
105
|
Davit
hull plugs added |
|
19
|
Bridge
roof framed with white |
106
|
Bulwark
stanchions added |
|
20
|
Bridge
joist header weather cover cleats |
107
|
#3 funnel pipes altered and shortened |
|
21
|
Triple
funnel whistles |
108
|
Reshaped
bridge bulwark to wing cabs |
|
22
|
Bridge
bell |
109
|
Rain
gutter added (raised roofs, superstructure bulwarks) |
|
23
|
Skylights
for Marconi/lavatory rooms on officers deckhouse roof
|
110
|
Drain
holes added to raised roof areas |
|
24
|
Removable
GSC skylight cover |
111
|
Hand
railing added to #3 funnel deckhouse |
|
25
|
Vent
to GSC skylight cover (aft side) |
112
|
Modify
bridge wheelhouse front from round to flat |
|
26
|
Portholes
on aft side of forward GSC skylight cover |
113
|
Knees
(wings) in corners of officer's deckhouse to GSC foyer |
|
27
|
GSC
skylight cover replaced (GMM version) |
114
|
Drain
pipes added to either end of raised roof of smoke room |
|
28
|
GSC
skylight horizontal bins port/starboard sides |
115
|
Service
hatch added to #3 funnel deckhouse roof |
|
29
|
Deckhouse
reflective lamp covers |
116
|
Vertical
conduits added to inside winged doorways of 2nd class
entrance |
|
30
|
Open
windows (officer's deckhouse) |
117
|
Passenger
class railing divider signage |
|
31
|
Officer's
deckhouse floor level skidlights |
118
|
Skylight
dome ribbing added |
|
32
|
Door
portholes |
119
|
Regular
benches added (GMM) |
|
33
|
Door
plates and knobs |
120
|
Powder
added to black paint to simulate soot on funnels |
|
34
|
Door
mats |
121
|
GMM
or Tom's Modelworks funnel ladders added |
|
35
|
Expansion
joints (x2) (forward and aft) |
122
|
Decklamps
on 2nd class entrance stern facing ducts |
|
36
|
Glass
added to windows (acetate) |
123
|
Railing
section behind davits for #7 & #8 lifeboats facing
stern |
|
37
|
Glass
added to windows (Kristal Klear) |
124
|
Deckhouse
lamps relocated (port side) (x2) |
|
38
|
Illuminated
door signs (x4) |
125
|
Horizontal
conduits to 2nd class entrance/elevator electric signs |
|
39
|
Grand
staircase added |
126
|
Small
cable retaining clips on halfway mark on funnels |
|
40
|
GSC
foyer aft port wall rebuilt and updated |
127
|
Small
brass handle at head height near bridge open port doorway |
|
41
|
Hydrants
(x16) |
128
|
Aft
GSC skylight housing portholes removed |
|
42
|
Reading/writing
roof extended |
129
|
Small
box in corner behind starboard bridge bulwark |
|
43
|
Belaying
bitts |
130
|
Rebuild
#2 funnel's forward box/trunk vent cover |
|
44
|
Davit
pulleys |
131
|
Paint
black recess openings on sides of curl vents |
|
45
|
Lifeboat
safety railings |
132
|
Add
louvered grill plate to starboard door on #4 funnel deckhouse |
|
46
|
Move
lifeboat davits out towards edge of ship |
133
|
Add
blankets for people/deckchair assemblies |
|
47
|
Repair
old davit tracks on deck |
134
|
Add
vent pipe down -inside- of #4 funnel |
|
48
|
Passenger
class railing dividers |
135
|
Add
interior to exterior support plates to inside cap of each
funnel |
|
49
|
Roof
railing kickstrips |
136
|
Add
oval shaped object on bottom sills of officer's deckhouse
windows (for the windows that opened ONLY) |
|
50
|
Marconi
room cable pole |
137
|
Single
window in bow wall of 2nd class entrance/elevator filled
in |
|
51
|
Funnel
grates |
138
|
Two
arched windows added to bow wall of 2nd class entrance/elevator |
|
52
|
Funnel
piping added and altered |
139
|
Railing
kickstrips added to boat deck aft overlooking well deck |
|
53
|
Hand
railings for outside wall on gym |
140
|
Dark
brown raised rib along above listed aft railing kickstrips |
|
54
|
Hand
railings for outside wall on GSC foyer |
141
|
Emergency
lifeboat support rigging connectors added (above gunwales) |
|
55
|
Compass
tower rebuilt |
142
|
New
pipe built from Gibb vent over to #1 funnel aft trunk
vent |
|
56
|
Compass
tower poles added |
143
|
New
block shape bracket under Gibb pipe (#143) at trunk vent |
|
57
|
Compass
tower canvas added |
144
|
Two
block shaped brackets under #4 funnel aft Gibb pipe |
|
58
|
Compass
tower sign added |
145
|
3
port holes on Smoke Room raised roof aft wall |
|
59
|
Reading/writing
room bow facing window added |
146
|
Two
button panel on inside of starboard wing cab |
|
60
|
Fine
painter lines on funnels (x16) |
147
|
Curved
duct from GSC Skylight aft port corner to deck vent |
|
61
|
Guy
wire bullseyes for #1 funnel wires (x4) |
148
|
Trim
GMM or model benches by 3mm for #4 funnel raised roof
area |
|
62
|
Gym
equipment added (bikes, cupboards, maps, rowing machine,
door) |
149
|
Trunk
added behind starboard bridge wing cab bulwark |
|
63
|
Box/conduit
added to forward starboard corner of 2nd class entrance |
150
|
Vent
motor unit conduits |
|
64
|
Tank
room window filled in (starboard side) |
151
|
Crew
stairwell canopy railings by bridge |
|
65
|
Deck
ropes added |
152
|
Trunk
added behind port bridge wing cab bulwark |
|
66
|
Hoses
added |
153
|
Small
platform on face of each funnel under whistles |
|
67
|
Depth
sounding spars |
154
|
Small
bracket behind funnel platforms under whistles |
|
68
|
Depth
sounding spar motors |
155
|
Small
curved pipes on the port face of each funnel by base |
|
69
|
Depth
sounding spar cables |
156
|
Bruce
Beveridge's doors/windows/lifeboat decalcomania added |
|
70
|
Rebuild
wing cabs |
157
|
Life
rings added to bridge bulwarks |
|
71
|
Rebuild
Morse lamps/semaphores |
158
|
Telegraph
handles added |
|
72
|
Rebuild
running light housings |
159
|
Marconi
room skylight gables to face port and starboard |
|
73
|
Add
running lights |
160
|
Bridge
ceiling joists |
|
74
|
Add
running light electrical conduits |
161
|
Railing
section forward of davits for #9 & #10 lifeboats facing
forward |
|
75
|
Add
wood railings on bulwarks, etc. |
162
|
Replace
Minicraft plastic deckhouse railings with GMM or Tom's
Modelworks deckhouse railings |
|
76
|
Add bench between ducts on 2nd class entrance (GMM spares) |
163
|
Grill
vent cover on Tank Room aft bulkhead above GSC skylight |
|
77
|
Add
bench to starboard aft side of #4 funnel deckhouse |
164
|
Bridge
deck planking weather cover bolt down connectors |
|
78
|
Separate
benches aft of 2nd class entrance |
165
|
Circular objects on rectangular centers of both Skylight
covers |
|
79
|
Delete
benches from sides of aft GSC skylight |
166
|
Alter
forward triple windows on starboard #4 funnel deckhouse
to just a single window |
|
80
|
Add
elevator stays for aft mast |
167
|
Fill
in window immediately aft of the forward door on the port
side of the #4 funnel deckhouse |
|
81
|
Sdd
#4 funnel mast stays |
168
|
Delete
railings from the aft end of #3 funnel deckhouse |
|
82
|
Officer's
deckhouse window retaining clips |
169
|
Add
small curved railing to port bow corner of Tank Room roof
|
|
83
|
Funnel
railings on sides of funnels (x3) |
170
|
Small
raised roof on starboard side of #3 funnel deckhouse |
|
84
|
Line
cleats on bridge bulwarks (beside liferings) |
171
|
Small
service hatch on starboard roof #3 funnel deckhouse by
trunk vent |
|
85
|
Add
doors (x5) (see missing door chapter) |
172
|
Small
safety railings added between vents and #4 funnel deckhouse
|
|
86
|
Conduits
on 2nd class entrance ducts (facing stern) |
173
|
Door
added to starboard aft side of Tank Room |
|
87
|
Doorway/stairwell
altered on aft side of #3 funnel deckhouse |
|
|